Wednesday, September 23, 2009

Goin' Down South

Despite the frustration I experience while planning a HSR line across the Bay State, I've attempted to tackle the Big Kahuna: the southern Northeast Corridor. This 225 mile line is the busiest in the country. Naturally, it has many important stations: New York (number 1 busiest in the country), Washington (2), Philadelphia (3), Baltimore (8), Wilmington (11), Newark (13), BWI Airport (15), and Trenton (24). Amtrak's Acela Express trains stop at each of those stations (though not all individual trains do) plus Metropark in New Jersey. Amtrak's Northeast Regional trains stop at an additional 8 stations, and the various commuter rail operations serve at least 40 more. The line has a very long history: part of the line runs over the oldest operating railroad bridge in the world, built in 1836. The most recent major change to the line is the electrification between Washington and Baltimore, which was completed in the late 1930's.

Theoretically, Acela trainsets can reach 165 miles per hour, but due to a number of constraints the average speed for a trip from DC to NYC is just 78mph. The trip currently takes 2hr 47min with 4 intermediate stops, and 2hr 52min with 6 intermediate stops. The magic number people want to achieve for DC-NYC travel time is 2hr 30min, which would mean an average speed of 90mph. To cut the journey by a further 30min to 2hr, the average speed would have to reach 112mph, a 40% increase over the current figure.

I experimented with a few sections of entirely new track, which turned out to be pointless. Building a 25 mile stretch of HSR track between Washington and Baltimore would cut travel time by only 10 minutes. That doesn't seem like a good way to spend $1.25B, which is what the new segment might cost. And trains would still have to crawl through the Baltimore and Potomac Tunnel. Creating a new line east of the Delaware was the only way to lay new track north of Wilmington. It would be very expensive and somewhat useless because it would bypass so many busy stations. Elsewhere, sprawl made a new line completely impossible.

The inability to plan a new line meant that incremental improvements would have to be the means for reducing travel time. Amtrak and its supporters have been arguing for more capital investment in existing NEC infrastructure for decades, but the funds allocated by Congress have been minimal. Below are the improvements I would suggest, in rough priority, based on reading a number of reports, reviewing track diagrams, and eyeballing aerial photographs. The four cost levels correspond to guestimates of <250M, $250M-$1B, $1-3B, and >$3B;.

  1. West Baltimore tunnels - The B&P Tunnel for passengers and the Howard Street Tunnel for freight are the biggest choke point in the entire corridor. They both need to be replaced for reasons that are very well explained here and here. Cost: high. Benefit: high.
  2. Catenary - The power system south of NYC is unique, and not in a good way. It supplies 11kV, 25Hz AC electricity, which is used nowhere else in the world. The configuration of the wires themselves limits top speeds to 135mph. The entire system between NYC and DC needs to be replaced for those two reasons, and general age. Cost: moderate. Benefit: high.
  3. Signaling - The current signaling system is sufficient, but higher densities (meaning shorter blocks) on the entire line would increase capacity. Cost: moderate. Benefit: moderate. Update 9/26: Amtrak has already installed a Positive Train Control system on its equipment, and plans to have all commuter and freight rail upgraded in the next few years.
  4. New Jersey flyovers - Northbound commuter trains entering the corridor from two branch lines in central New Jersey (one is just a stub, really) have to cross the two southbound tracks and the northbound express track before continuing. This creates safety and scheduling issues that should be eliminated. Cost: low. Benefit: low.
  5. Curve straightening - There are a number of areas where curves could be eliminated. In most locations, doing so would reduce travel time a small amount (15-30 seconds or so) and at the same time would increase passenger comfort and eliminate higher wear curved track. Cost: low (each). Benefit: low (each).
  6. West Delaware track and curve - From Wilmington south to Newark there is a section of the line with only three tracks. Newark is the southern terminus of the SEPTA commuter rail system, so adding track would reduce scheduling conflicts. There is also a curve on the section that could be eliminated. This work could be done in conjunction with the bypass below. Cost: low. Benefit: low.
  7. East Baltimore tunnels - The two relatively short bores of the Union Tunnel east of Baltimore's Penn Station have a total of only three tracks, and need to be rebuilt due to age and height issues. Cost: high. Benefit: low.
  8. North New Jersey bridges - Two movable bridges just north of Newark need to replaced. Cost: high. Benefit: moderate.
  9. Northern Maryland bridges and track - Between Baltimore and the Delaware state line there are three two-track bridges in an area with only three tracks. New bridges need to be added for capacity reasons, and the originals eventually replaced, and another track added to help fully utilize the new capacity. Cost: high. Benefit: moderate.
  10. Central Maryland track additions - Most of the segment between Baltimore and DC has only three tracks. Another track would add capacity. Cost: moderate. Benefit: low.
  11. Wilmington bypass - The Wilmington station is in a very constrained area, has only three tracks, and is bounded by sharp curves at both ends. The solution here would be to bypass downtown Wilmington with two high-speed tracks. The existing track would remain, but through traffic would zoom on by. Cost: high. Benefit: low.
  12. North Jersey track additions - A short section of track from just south of Elizabeth north to Newark Airport narrows down from 6 tracks to 4. More tracks would help scheduling in a busy area, but the construction would be difficult due to the surrounding area of dense urban development. Two curves could be eliminated as well. Cost: moderate. Benefit: low.
  13. Northern Jersey viaduct - This 10 mile long structure from south of the Newark airport to near the Hudson tunnels entrances would bypass three stations (Secaucus Junction, Newark Penn, and Newark Airport), two movable bridges, and a rail yard. Cost: extreme. Benefit: low.
  14. 30th Street Station approaches - The track and switches on either side of the main Philadelphia station are a mess. Consensus opinion is that the situation needs to be addressed, but I have no idea about how large of an undertaking it would be. Cost: ? Benefit: ?

I think completing items 1, 2, 5, and 6 would shave 15 minutes off the trip. Items 3, 4, and 10 might save some time, but most likely they would just allow for more trains to be scheduled. But increased service frequency is a worthwhile goal, too, especially for the commuter rail systems. Items 8 and 9 might save 2 minute each, but the main purpose for undertaking them would be end-of-life replacement of the existing infrastructure. Item 7 is another project that is important due to age, though the time benefit would be negligible.

Completing tasks 1-10 would bring travel time to 2hr 25min. Not bad. Amtrak experimented with a limited service Acela train, which had only one intermediate stop at Philadelphia. The journey time on the offering was 10 minutes faster than regular Acela service. Completing item 11 would allow for another intermediate stop at Baltimore without changing the travel time. The rest of the projects - items 12, 13, and 14 - might wring a few more minutes out of the journey time, but 2hrs 15min for a limited service train would be pretty good. Northeast Regional trains would benefit, too, though the amount would be less because the catenary upgrades wouldn't change their top operating speed.

(Updated 9/28) How could I have not posted these links at the beginning?

Tuesday, September 22, 2009

I, For One, Will Welcome Our New French Overlords

According to the Transport Politic, SNCF has submitted proposals for several of the FRA designated HSR corridors. This is an interesting development because the French definitely know a thing or two about high-speed rail. However, even if the inevitable knee-jerk dismissals were surmounted and SNCF won a bid, cultural differences would make the implementation a disaster. Entirely stupid, but that's just the way things are. The French are more likely to win a contract in Canada, which is once again mulling HSR for the Windsor-Québec corridor.

Patterns on the Land

I've created two more maps of rail lines: one for New Hampshire and one for Southern Québec. I find it interesting how different the land-use patterns are between the two areas. Note that I'm working off a variety of old maps, some of which are merely diagrammatic. Thus the exact alignment of some abandoned lines is unknown, and I've certainly left out items.

As a side note, the mapping interface is pretty buggy (at least in my browser). When the number of items on the left side exceeds one page, the list starts doing weird things. The behavior makes sorting the items nicely a real pain in the arse. Hopefully Google will fix this soon.

Update 9/27: I found a very nice repository of old Canadian topo maps, so I'm now pretty confident the routes I've traced are accurate.

Saturday, September 19, 2009

Baked Bean Breakdown

Another day, another high-speed rail analysis. Designing a line for Massachusetts was difficult for two reasons. In the eastern third of the state, sprawl is almost continuous. In the western half, there is again sprawl around Springfield, and then an area of very jumbled geography. None of the mountains are particularly high, but at the same time there are no large, level valleys that can be used to approach the highest peaks. Anyway, in the eastern half or so, the best solution was to parallel I-90. Following the current CSX alignment wasn't possible because it runs through the center of so many towns. In the west, because of the built environment west of downtown Springfield, a detour to the south was necessary. After that, it was a matter of finding the least bad route until the rail line could meet up with I-90 again. To keep speeds up, several tunnels and viaducts were needed.

I think the main takeaway from this exercise is how restrictive the sprawl around American cities can be on new transportation construction. Most existing rail lines were first laid out in the 1800s, and the Interstate Highway System was planned in the early 50s, when the population was half of what it is now, and much less suburban. Projects planned now, unlike those other two, have to deal with a built environment that is fully built up within a 20 mile radius of large city centers. And large city centers are where high speed rail lines need to go.

Tuesday, September 15, 2009

Capital of the Empire

Truth be told, my exercise in planning a high-speed rail station in Burlington was not very challenging. It is a small city in a very rural state, so I found it easy to get a line close to downtown without having to plow under hundreds of homes. So I decided to do another analysis

This time I chose the Albany-Schenectady-Troy, NY Metropolitan Statistical Area, a.k.a. the Capital District. It is a much more populous area than the Burlington, VT MSA, being home to over 1.2 million people by the Census Bureau's estimates. And it is a major rail hub, with seven main lines radiating from the area. Albany is the top of the "Selkirk Hurdle," which is shorthand the detour trains must make due to the lack of freight rail connections across the Hudson below the city. Any freight destined for New York City or southern Connecticut has to either cross the river (which is really a long, narrow fjord below Troy) on CSX's Alfred H. Smith Memorial Bridge just below Albany, or be transferred to truck, usually at the Port of New Jersey, and driven into the city. A freight rail tunnel from New Jersey to Queens is being planned, but its opening will be many years in the future.

Before I started laying out track I created a number of requirements. One was that there would be four HSR lines converging on the area, one from each of New York City, Boston, Buffalo, and Montreal. However, only four of the six possible city pairs needed to be easily completed (BOS-BFX, BOS-MTL, NYP-BFX, NYP-MNT) as there would be better routes for the other two (BOS-NYP, BFX-MNT). Another was that the station(s) should be as close to downtown(s) as possible. A third was that the considerable freight traffic in the region not be permanently impaired. And of course minimizing destruction and disruption would be nice.

It turns out keeping the freight moving wasn't so hard for the five lines south of the city. But getting freight arriving from the north on CP or from the east on PAR to the five southern lines, along with the reverse, was much more problematic. Currently, some of it passes through Albany along the waterfront, but most of it goes through downtown Schenectady. Building a new line to connect the south end of CP's Mohawk Yard to CP's line south to Binghamton was key to untangling the knot of lines in Schenectady. I located this line on the north/west bank of the Mohawk, but a crossing further west could accomplish the same end.

With the Schenectady choke point gone, the rest of the pieces fell into place pretty easily. The most disruptive element would be the new station in Albany. The current station across the river in Rensselaer, while not very far physically, cannot be accessed from Albany on foot. A pedestrian bridge could be built over the Hudson, but I think most people would be uncomfortable using it at night. The station would also have to be reconfigured extensively to accommodate the much longer HSR trains and an extra set of tracks. The original Albany Union Station is in a great location, but the ROW has been mostly obliterated by the waterfront highway, so it can't be reopened. An alternative would be to excavate a tunnel, but that would be very expensive and disruptive. Plus, it could only be accessed by electricity-powered trains. I thought the best solution would be build a new station on the Albany side of the river in an area that consists mostly of warehouses and small businesses. I am not a fan of "urban renewal" projects that destroy acres of existing city fabric, but at least this project would allow expansion of the downtown area northwards once the existing lines were removed.

As for the rest, hopefully the map explains itself. Enjoy!

Tuesday, September 8, 2009

Just Passing Through

I was looking at my HSR network again and started wondering about having the NYC-Montreal line pass through Burlington. Here is a quick analysis of the area. I'll have more about it later.

Update: My mapping has succumbed to feature creep.

I've developed four "alignments" for where a HSR line might be run near Burlington. From west to east they are:

  1. Downtown Alignment - Of course, my first instinct was to put the line through downtown. It turned out to be the worst choice by far. It would cut the city off completely from it's small but developing waterfront, there would be no room for parking, it would create a lot of traffic through the city, it would have to share track with the local shortline freight railroad, and there would be no room for run-through tracks. The only upside is that downtown (which is up the hill from the station) would be within easy walking distance.
  2. UVM Alignment - Running the line near I-89 might be the best choice. The station would have good highway access, it would create little additional traffic through residential neighborhoods, it would be within walking distance of UVM, and it would be closest to the major hotels clustered along Williston Road. The downside is that it would be the most disruptive to existing buildings, and it would displace UVM's working farm. It might also be too close to Fletcher Allen, disrupting patients with noise and vibration, and it would not be within easy walking distance of downtown.
  3. Airport Alignment - Running the line near the Burlington International Airport would be the least disruptive to the existing built environment. Passengers would be close to currently operating rental car agencies, but not much else.
  4. Suburban Alignment - Locating the line and station out in the 'burbs (such as they are in Vermont) would put tourists a few miles closer to the ski resorts, but at the same time draw development well away from downtown. There would be plenty of room for parking.

Of those 4 alignments, my choices, in order, are: 2, 3, 4, 1. I wish that the downtown alignment could work, but it wouldn't. It would be so damaging that I'd rather see the line on the other side of the lake.

Just for kicks, I extended the downtown and suburban alignments to the Canadian border and all the way to Schenectady. The placement of each is strictly guesswork; I did it mostly to get a sense of what kind of disruption a line would bring to the Vermont countryside. I also populated the map with lots of other tidbits that only a railfan would find interesting. I'll probably move a lot of these to a separate map at some point.

Update: I've cleaned up the Burlington map. See the post above for railfan stuff. I've also made a high level map of the Federal High-Speed Rail Corridors for reference.

Sunday, September 6, 2009

Need for Speed

I can't stop myself. Srsly.

After reviewing my first try at designing a HSR network, I realized I was somewhat over-eager in drawing lines. I decided to represent the top cities visually instead of working off a list.

Cities are colored as follows:

  • Red - top 20 metro areas, 37% of the population, cutoff at 2.67m
  • Cyan - next 20 metro areas, 50% cumulative total of the population, cutoff at 1.32m
  • Green - next 20 metro areas, 56% cumulative total of the population, cutoff at 830k
  • Magenta - next 40 metro areas, 65% cumulative total of the population, cutoff at 500k
  • Brown - next 100 metro areas, 75% cumulative total of the population, cutoff at 200k
  • Orange - next 82 metro areas, 80% cumulative total of the population, cutoff at 132k
  • Yellow stars - state capitals that are not top 100 cities
  • Cities in Mexico and Canada are classified according to where they would fit into the American rankings.

Rail lines are colored as follows:

  • Red - core national lines, track built to full HSR standards (180mph)
  • Cyan - important national lines, track to HSR standards wherever possible, MSR standards (110mph) otherwise (changed from blue)
  • Green - regionally important lines, track to MSR standards wherever possible, SSR standards (79mph) otherwise
  • Magenta - spur or infill lines, track to MSR or SSR standards

This map shows only the top 100 cities and the national lines. Most of the changes are in the Southeast, where one core line was relocated and several national lines were downgraded to the the third tier.

Here is a closeup of the Northwest from a map with all 282 metro areas and all four classes of lines. The main change in this region was the upgrade of the eastern Washington line to tier 4.

The main changes in the Southwest were the addition of a spur to Reno and an upgrade of the central coast line. There were several priority changes in the mountain region, but the segments remain isolated.

The relocation of the core route through Spartanburg instead of Columbia and Augusta was the biggest change in the Southeast. The Piedmont region saw a lot of changes, and it still remains in flux as I have more to learn about the physical geography in the area.

Routing in the Northeast was little changed aside from some priority alterations.

For comparison, I overlaid a map of the US national lines with a map of France at the same scale. French HSR lines are shown in dark blue, along with the Channel Tunnel and HSR1 in the UK. The comparison really underlines the scale of the undertaking that would be needed to build out a HSR network in the US. The distance from Lille to Marseilles is roughly the same as from Sacramento to San Diego, and Raleigh to Boston compares to the journey from Marseilles to London.